Consumer unit and protection
RCD, MCBs, control switch and surge protection as applicable. Their presence does not mean they are correctly rated.
The CIE is not a decorative piece of paper: it certifies that your installation complies and it is what allows you to contract or increase a supply. Here is the real process.
Issued by a qualified technician · We handle the file and the distributor submission
The Certificado de Instalación Eléctrica (CIE), commonly called the boletín, is the document issued by an authorised installer after verifying that an installation complies with the Low Voltage Electrotechnical Regulations. Without it, the distributor will not connect a new supply or authorise certain changes.
It is not a supplier invoice and it is not an electricity contract. It is a technical document about the installation itself.
Important: the certificate is issued by a qualified technician. Benefits Factory manages the prior inspection, the corrections, the documentation and the submission to the distributor, so you deal with one company throughout.
A certificate signed without inspecting the installation is a problem for you and for whoever signs it. This is the minimum that must be verified.
RCD, MCBs, control switch and surge protection as applicable. Their presence does not mean they are correctly rated.
Number of circuits, cable cross-section, earthing and problem points. An overloaded circuit does not pass a serious inspection.
Continuity and resistance. It is the most neglected protection and the one that matters most for people.
Account holder details, cadastral reference or address, requested power and the distributor for the area.
We check the installation and identify what must be corrected before the certificate can be issued.
If something does not comply, we quote the fix. Without it there is no valid certificate.
The authorised installer issues the certificate and it is registered under the regional procedure.
With the CIE we request the new supply, the upgrade or the change.
Buying a certificate without inspecting the installation. If the distributor later inspects, or there is an incident, the document does not protect you. A certificate must reflect what is really there.
Increasing power without upgrading the unit. The certificate may show the new rating, but if the wiring and protection cannot carry it, the risk is yours.
Confusing the CIE with an energy performance certificate. They are different documents for different purposes. The EPC rates efficiency; the CIE certifies electrical compliance.
Price: it depends on the power rating, the state of the installation and the corrections needed. We do not publish a flat rate because it would be misleading. We quote after reviewing the case.
We cover Palma and the rest of Mallorca. Availability and arrival time depend on the area and the moment: we confirm it when you call.
Municipal pages are published only once there is real local work and unique content for that town.
We do not handle dangerous emergencies through a form: if there is smoke, sparks, a burning smell or a hot consumer unit, switch off the supply if you can do so safely and call.
Response time: the phone is answered 24 h. Attendance is assigned by area and by the technician available at that moment; we give you a specific window when you call.
Tell us whether it is a house or premises, the power you need and which procedure you are in. We will call to arrange the inspection.
There is no single validity period: it depends on use and on the applicable regulation. For a specific procedure, the distributor or the competent authority sets the required validity. If your certificate is old, it is worth inspecting the installation before relying on it.
Normally no. Switching supplier does not require a new certificate if the supply is active and the installation is unchanged. It may be required for new supplies, upgrades or reconnections.
Yes, with different requirements depending on power and use. Premises with industrial kitchens or machinery need a specific design.
We quote the necessary corrections. We do not issue a certificate that does not reflect the real state of the installation.
Yes. We submit the file and follow it with the distributor until it is resolved, without you having to call.
We give you a written timescale with the quote, separating inspection and issue from the distributor process. If corrections are needed, they are quoted first and added to the agreed timescale.
Tell us the case: house or premises, power rating and which procedure you are in. We will tell you what is needed and handle it.